Resources / Case Studies

From Licensing Risk to Infrastructure Stability

Three colleagues talking together at a table with open laptops

This large credit union was strategically migrating away from VMware when abrupt Broadcom contract changes accelerated timelines and increased operational pressure. Mission-critical communications infrastructure could not run in new environment, creating a stranded workload challenge with no room for disruption. Expedient was brought in to deliver a trusted VMware bridge environment and Expedient Edge Infrastructure as a Service (IaaS), powered by Nutanix, to keep critical systems fully operational throughout the transition. The result was a stable, flexible path forward to compliance and data sovereignty without unnecessary business disruption or licensing costs.

Challenges

Unexpected Broadcom contract changes accelerated migration timelines and eroded leadership confidence

Stranded VMware workloads created critical gaps requiring immediate bridge infrastructure solutions

Mission-critical communications infrastructure could not run in new environment

Leadership needed a trusted path to data sovereignty and compliance

Outcomes

Check circle icon

Seamless transition to VMware environment and compliance

Check circle icon

Mission-critical systems kept fully operational

Check circle icon

Millions in unnecessary costs eliminated

More Case Studies

Let’s Talk.

Ready to talk to someone about turbocharging your transformation and simplifying your cloud journey? Want to request a demo or walkthrough? Just have questions about how our services work? Talk to an expert.

Telephone

(877) 570-7827

Contact Support

Sign In