A manufacturing organization faced three critical infrastructure challenges converging in 2026: a 300% VMware licensing cost increase, the required relocation of its DR environment, and the migration of 500 VMs, including 170 tier 1/2 critical applications, from VMware to Nutanix AHV. Expedient architected a dual-platform disaster recovery and migration solution designed to maintain DR coverage throughout the transition while reducing risk and operational burden.

Challenges

300% VMware licensing cost increase forced migration off the platform

Required relocation from its existing DR site by December 2026

500 VMs, including 170 tier 1/2 critical applications, to migrate to Nutanix AHV

Need to maintain business continuity and DR coverage throughout the transition

Outcomes

Check circle icon

DR coverage maintained through the migration approach

Check circle icon

Dual-platform capability reduced migration risk

Check circle icon

Operational burden reduced for the internal IT team

More Case Studies

Let’s Talk.

Ready to talk to someone about turbocharging your transformation and simplifying your cloud journey? Want to request a demo or walkthrough? Just have questions about how our services work? Talk to an expert.

Telephone

(877) 570-7827

Contact Support

Sign In
VMware
September 29th, 2026 at 1:00 PM ET

It’s Time to Decide Your VMware Path

Join us →

VMware

September 29th, 2026 at 1:00 PM ET

It’s Time to Decide Your VMware Path

Join us →