# From Partner and Pricing Turbulence to a Safe Path with Bridge Licensing

A manufacturer faced an 800% VMware renewal increase and an expiring contract, with multiple sites at risk of disruption and no completed migration path in place before the deadline.

Source: https://expedient.com/knowledgebase/resources/case-study/from-partner-and-pricing-turbulence-to-a-safe-path-with-bridge-licensing/

# [Resources](/knowledgebase/resources/) / [Case Studies](/knowledgebase/resources/case-studies/)

## From Partner and Pricing Turbulence to a Safe Path with Bridge Licensing

 ![Three colleagues reviewing a document together in an office]()

A manufacturer faced an 800% VMware renewal increase and an expiring contract. Their IT operations partner could not complete the migration from VMware to Microsoft Hyper-V before the deadline and they were running out of time. This put multiple sites at risk of disruption. Without bridge licensing or a temporary workload environment, critical operations faced potential shutdowns. As a long-standing Expedient colocation client, the company turned to us for help. We delivered a stabilization strategy through bridge licensing that gave them time to complete the transition and put them on a safer path to modernization.

### Expedient Services

[Expedient Bridge Program →](/solutions/challenge/expedient-bridge-program/)

[Expedient Enterprise Cloud (EEC) →](/services/cloud/)

### Industry

[Manufacturing →](/solutions/industry/manufacturing/)

## Challenges

Three-year VMware renewal came with an 800% price increase

VMware contract expiration timing created immediate operational pressure

IT partner could not complete production migration from VMware to Hyper-V before the deadline

Multiple sites faced potential shutdowns without bridge licensing or a temporary environment

## Outcomes

![Check circle icon](https://res.cloudinary.com/dvlpy3tua/image/upload/fl_sanitize/uploads/EXP_Check_Circle_Icon.svg)

VMware workloads across multiple sites were licensed and compliant before deadline

![Check circle icon](https://res.cloudinary.com/dvlpy3tua/image/upload/fl_sanitize/uploads/EXP_Check_Circle_Icon.svg)

End-of-life hardware infrastructure leasing in place, avoiding renewal costs

![Check circle icon](https://res.cloudinary.com/dvlpy3tua/image/upload/fl_sanitize/uploads/EXP_Check_Circle_Icon.svg)

EEC Service Port ready for workload migration into multi-tenant cloud environment

## More Case Studies

[ 

### Modernizing Government Operations with an AI Enabled Enterprise

When digital transformation became a top priority for this large state county government, delivering a secure, enterprise-grade AI solution quickly became an operation...

Learn More → 

 ](/knowledgebase/resources/case-study/modernizing-government-operations-with-an-ai-enabled-enterprise/)[ 

### Transforming Full-Day Banking Outages into a Resilient Cloud Foundation

A federally regulated savings bank was facing growing operational risk from an unreliable hosting provider that could not deliver the reliability and stability the ins...

Learn More → 

 ](/knowledgebase/resources/case-study/transforming-full-day-outages-into-a-resilient-cloud-foundation-bank/)[ 

### Transforming Full-Day Outages into a Resilient Cloud Foundation

An MSP was struggling with recurring downtime and instability from its incumbent VMware data center, creating growing SLA exposure, compliance concerns, and risk to cl...

Learn More → 

 ](/knowledgebase/resources/case-study/transforming-full-day-outages-into-a-resilient-cloud-foundation-msp/)

## Let’s Talk.

Ready to talk to someone about turbocharging your transformation and simplifying your cloud journey? Want to request a demo or walkthrough? Just have questions about how our services work? Talk to an expert.

What are you interested in?Artificial IntelligenceVMware and BroadcomEdge ComputingCloudSecurityDisaster RecoveryColocationCost managementBackupsCompliancePublic Cloud

Submit 

### 

### Telephone
[(877) 570-7827](tel:18775707827)

### Contact Support
[Sign In](https://expedient.com/support/index.html)

VMware

September 29th, 2026 at 1:00 PM ET
## It’s Time to Decide Your VMware Path

[Join us →](https://go.expedient.com/VMWarePath)

### VMware

September 29th, 2026 at 1:00 PM ET
## It’s Time to Decide Your VMware Path

[Join us →](https://go.expedient.com/VMWarePath)
